Wapakoneta WWTP Phase 1

Wapakoneta WWTP Phase 1

This $6.4 million project was completed in April 2015.  Included in the project was a Wet Weather Pump Station rated at 25 MGD that was 40’ deep and required significant shoring and dewatering systems.  Also, included was 150’ diameter EQ Basin, Control Building, 600 LF of 36-inch sanitary gravity sewer, 700 LF of 30-inch force main, and all interconnecting piping between the structures.